Installation & Maintenance
Install only on approved sub-floor surfaces
Follow detailed installation instructions.
Installation of ESD Static Control Solid Vinyl Flooring.pdf PDF format (2,580KB)
Install only on sub-floors which have a permanent Moisture Barrier and are dry <3.0 lb/1000 sft. vapor emissions; 85% rH and with a pH of 7-9 per Moisture Limitation Specification
Rolls:
loose lay as mats
Install with Sigaway® Electronic full surface conductive dry adhesive or with Sigaway® Original regular dry adhesive with Siga Circuit seam bridging tape.
Install with UZIN KE 2000 SL water based conductive adhesive.
Heat welding
Permanently glued rolls must be heat welded.
Maintenance
Follow detailed maintenance instructions.
Cleaning Instructions for ESD Static Control Flooring PDF format (133KB)
Limited Warranty
Limited warranties vary by product, and are applicable only if materials are installed professionally on suitable and approved sub-floors Concrete Subfloors and Moisture Testing with approved adhesives and within the approved moisture limits, on sub-floors which have a permanent Moisture Barrier and are dry <3.0 lb/1000 sft. vapor emissions; 85% rH and with a pH of 7-9 per. |